Deciding what content to make when two ideas both look fine
Impact-effort scoring settles the easy cases and stalls on the close ones. The filter that runs before scoring, and a tiebreaker that actually breaks ties.
On this page · 6 sections
- 1. Where impact-effort scoring runs out
- 2. Three questions that decide what content gets made, before scoring
- 3. The tiebreaker: who would you hate to see publish it first
- 4. The standing veto, and what a slot actually costs
- 5. Make one of them cheap enough to be wrong in public
- 6. Write the rejection down or pay for it again in April
Two ideas leave the planning meeting dead level. One is a teardown of how procurement teams really build a shortlist; the other is a pricing piece with a calculator in it. Both are about three days’ work, both scored a seven, and one of them has to go first. Deciding what content to create at that point has stopped being a scoring problem, because the grid has already said everything it knows.
Where impact-effort scoring runs out
A scoring model works by producing a spread, and its inputs are estimates. Projected reach carries an error of maybe half its own value in either direction; effort carries about the same — and in the wrong direction more often. Where two ideas differ by a factor of three, the error is irrelevant and you would have reached the same answer in the corridor. Where they differ by a point, the ranking sits inside the error, and the model is handing you noise with a decimal place attached.
So the grid resolves the cases you didn’t need it for and goes quiet on the ones you brought it. That much is a nuisance, and survivable. The real damage is the second effect: scoring rewards legibility. An idea whose value is easy to express in the units the grid uses will beat an idea whose value is real and awkward to state. Search volume is legible. “This settles the objection our salespeople keep losing on” is not, unless somebody built a column for it, and nobody does. Run a grid for a year and the library drifts toward whatever the grid can see, which nobody chose and nobody notices.
None of this means scoring is useless. It means the tie has to be broken by a different kind of question, and that question needs something above it to appeal to. Where the decisions that would let a tie be settled without a meeting were never made, every tie becomes a fresh strategy meeting held under time pressure. The same two ideas can also rank in opposite orders under different strategies: the teardown leads for a firm running an authority play and trails for one running a funnel builder. Part of any tie was settled on the day the direction question got answered, or wasn’t.
Three questions that decide what content gets made, before scoring
Run these across the whole list before ranking. Each one kills ideas outright, which is worth more than ordering them, and what survives is short enough that a tie means two ideas, not 12.
Which claim does this advance, and how much proof does that claim still owe? If you can’t name the claim, you have a topic. If you can, prefer the idea attached to whichever claim is furthest behind on evidence. This is where a pillar that arrives with a burden of proof attached earns its keep, because a claim generates its own next brief and a category can only generate a next slot.
Who asked for this, in their own words? A persona doesn’t count. You want a specific person, or a line you’ve heard three times in sales calls. The strongest version is an objection you keep losing to, which no keyword export will ever contain, since nobody searches for their own counter-argument. Hunting those down is a separate exercise with its own three inputs and a named owner for each.
If it works, what’s the next one? An idea with nothing behind it is a one-off, and one-offs are how a library ends up as 90 unrelated pieces with a decent average. Prefer the idea that already has a second and third piece attached. This question also quietly kills the clever idea nobody could repeat, which is the one most likely to win a room.
Cut anything that fails two of the three. In most planning meetings that removes about half the list, and it removes it for reasons you can say out loud to whoever suggested it.
The tiebreaker: who would you hate to see publish it first
Two survivors, same score. Ask which one you’d mind about if your closest competitor published it in six weeks.
Name the competitor and keep the date. The vague version returns yes for everything, because everything sounds worth having in the abstract, and a specific firm on a specific timescale produces an answer before you’ve finished asking. It’s frequently not the idea the grid preferred.
The mechanism is worth understanding, because it tells you when to trust the answer. Projected reach is a forecast and you’re bad at forecasts. Regret is a judgment about position, and you’re good at those, because it draws on everything you know about your market that never made it into a column. The question routes around your estimating error by asking about something you have direct access to.
It has a second property that does more work. An idea you’d mind losing is one where you hold a temporary claim: you can say it first, or better, or with proof nobody else has. An idea nobody would race you to is either permanently yours or wanted by no one, and you can tell those apart by asking whether a competent person could argue with it.
Where it breaks: regret over-selects for competitive anxiety and under-selects for durable reference work. Nobody is racing you to publish the definitive setup guide for your own product, and you should still publish it. So scope the tiebreaker to the slot rather than the calendar. Reference and coverage pieces get decided on completeness and gap. Regret decides between ideas competing for the same argument slot, and using it everywhere produces a magazine.
The standing veto, and what a slot actually costs
Some ideas pass all three questions, win the tiebreaker, and still shouldn’t be made. The reason is displacement. Capacity is fixed, so approving a piece also approves the absence of everything else that would have filled that slot for however long it takes.
Four vetoes, written once, applied without re-argument.
- Anything that consumes hours from the person who is already the bottleneck. If your review gate clears five pieces a month, an idea that eats two gate slots has spent 40% of the month.
- Anything you can’t keep true. A pricing comparison, a tool roundup, a table of other people’s numbers: each carries a maintenance liability, and a liability nobody has agreed to pay rots in public with your name on it.
- Anything on-brand and off-claim. Nobody objects to it and nothing depends on it, which is the exact profile of work that fills a calendar and moves nothing.
- Anything whose only sponsor is somebody senior. The requester’s rank is not an input, and writing that down in advance is the entire point, because in the moment it’s unsayable.
That last one is the same discipline as presenting one recommendation with the two rejects named beside it. Choosing is the job you were hired for, and a veto that gets re-litigated every time it bites was always a preference.
Make one of them cheap enough to be wrong in public
The better move, where it’s available, is to dissolve the tie instead of resolving it. Ship one idea in the cheapest form that can still fail: 400 words to the list, a section inside a piece already in production, one post that makes the argument without the evidence behind it. A week later you have a reading instead of a judgment.
The constraint is that the cheap version has to test the same thing the expensive one would. For arguments it does. A blunt short version of a claim draws the same reaction as the long version, sooner, and if the reaction is silence you’ve saved three days. For reference assets it doesn’t, because they work by being complete, and a partial one tests only whether people would like a finished one. They always would.
Reckon on this being available for about half the ties you’ll face. Where it is, it beats every framework here including the tiebreaker. Where it isn’t, that’s information: an idea with no cheap version is a bet, and worth booking as one, so split it from the things you’re committing to and the things you expect before it lands in a plan.
Write the rejection down or pay for it again in April
One line per killed idea: what it was, the date, the reason, and the condition that would bring it back. That takes 20 seconds, and it’s the same artifact as a channel refusal list.
Skip it and the idea returns next quarter with a new advocate, and you pay the decision cost twice. It usually wins the second time, because its sponsor has had three months to build the case and you’ve had six other arguments since. A rejection with a written reason can be checked against that reason. A rejection with no record is indistinguishable from an idea somebody keeps mentioning, which is how a calendar full of scheduled topics quietly stops carrying any decisions at all, and that collapse is the one that looks healthiest from outside.
An idea rejected without a written reason gets published eventually. Not because it won the argument, but on some slow week in April, by whoever was tired of having the conversation.